A Prestigious Project for Grade II Listed Pioneer Centre – London

AGM/Aquatech Pressmain were asked by specialist management property company Dealmore Commercial to supply a booster set to boost the water to the luxury apartments at the Grade II listed, Pioneer Centre.

The AMV 3 booster set needed to be housed in the swimming pool plant room. So, to meet the requirements of the chlorine atmosphere, Aquatech Pressmain designed and built bespoke components in 316 stainless steel including the manifolds, pump wet ends and control panel.

The Centre was built in 1935 to a design by architect Sir Owen Williams and described by Walter Gropius as “An oasis of glass in a desert of brick.” So, this was an especially interesting and enjoyable project.

Dealmore Commercial have a maintenance contract with AGM so having supplied and installed the bespoke equipment they have peace of mind knowing AGM will also regularly maintain and service it.

If your building needs a bespoke solution, please contact our Sales or Projects Departments on 01206 215100.